Bathroom renovations in Mount Roskill range from a single shower replacement to a complete bathroom fitout with new tiles, vanity, toilet, and shower. Muir Plumbing, Gas & Drainage handles all the plumbing work for bathroom renovations — hot and cold supply, waste connections, shower installation, toilet rough-in, and tap fitting. We work with homeowners directly or alongside builders and tilers. Partial renovations (shower + toilet swap) typically cost NZD $1,500–$4,000 for plumbing work. Full bathroom plumbing fitouts run $3,000–$8,000+ depending on scope. We serve Mount Roskill, Blockhouse Bay, Epsom, and surrounding Auckland suburbs.
| Scope | What's included | Typical plumbing cost (NZD) | Timeline |
|---|---|---|---|
| Shower replacement | Remove old shower, install new base + screen, connect water | $800–$2,000 | 1–2 days |
| Toilet replacement | Remove old toilet, install new suite, connect waste + supply | $400–$800 | Half day |
| Vanity replacement | Remove old vanity, install new, connect taps and waste | $500–$1,200 | Half–1 day |
| Partial reno (shower + toilet + vanity) | All above combined | $1,500–$4,000 | 1–3 days |
| Full bathroom fitout (new build or gut reno) | All rough-in + fitoff, waste, supply, shower, toilet, vanity | $3,000–$8,000+ | 3–7 days |
| Shower waterproofing fix | Re-seal, regrout, or replace membrane | $600–$2,000 | 1–3 days |
How long does a full bathroom renovation take?
- The plumbing component of a full reno typically takes 3–7 working days
- We work in stages: rough-in (pipes in walls) then fitoff once tiling is complete
- Total project time depends on your builder and tiler — we coordinate with them
- We give a schedule at the start so you know when to expect each stage
For related work, see our Kitchen plumbing services.
Do you handle shower replacements and toilet installs?
- Yes — shower base and screen installation, waste connection, hot and cold supply
- Toilet suite replacement including waste rough-in, cistern, and seat
- We supply or work with fixtures you've already purchased
- All work meets NZ Building Code G12 (water supply) and G13 (foul water)
For related work, see our Plumbing maintenance services.
What's included in a partial vs full bathroom fitout?
- Partial: swap out fixtures (shower, toilet, vanity) without changing tile layout or wall structure
- Full fitout: demolish existing, relocate waste and supply if needed, rough-in to new plan
- Full fitout requires building consent in some cases — we can advise
- We quote both options clearly so you can make an informed call
For related work, see our Plumbing maintenance services.
Do bathroom renovations need building consent in Auckland?
- Like-for-like fixture swaps (same position, same waste layout) usually don't need consent
- Relocating a shower, toilet, or vanity often triggers consent because you're changing the drainage layout
- Waterproofing membrane work in wet areas must meet NZ Building Code — we install to code regardless
- We advise on consent requirements before quoting so you're not surprised mid-project
For related work, see our Leak detection services.
Common questions
Bathroom Renovations — FAQ
Useful links
Bathroom Renovations across Auckland
We provide bathroom renovations services across Auckland. Click your suburb to find out more.
Last updated: 5 June 2026